Ennis Hospital
project information
This 30,000sqft 50 bed ward replacement scheme. With associated en-suite hospital bedrooms were required for the hospitals change of use. Based on the HSE “Teaghlach model” we produced a home from home environment for elderly patients requiring long term medical treatment.
Glenbeigh assembled a pre-approved design team to develop this replacement scheme along with another 2 similar schemes on the HSE D&B Framework.
Ennis Hospital project used system build technology to produce a highly insulated / air tight building surpassing current building regulations on average by over 20%.
Disruption to the existing hospital was kept to an absolute minimum as the majority of the building was manufactured off site.
Client | HSE |
Location | Ennis, Co. Clare |
Architect | Coady Partnership / O'Connell Mahon |
Role | Design & Build Main Contractor |